Darius and Girenas Stadium, Kaunas, Lithuania

Darius and Girėnas Stadium

Darius and Girėnas Stadium is the first sports arena, to meet UEFA Category 4 standards in Lithuania. The renovation process lasting almost four years is scheduled to be finished in 2022. Recent upgrades will allow sports fans to enjoy competitions and sports events even during the cold and rainy seasons. The area which is equipped with a hybrid coating adapted for use in various weather conditions reaches up to 7,140 m2. More than 33 kilometers of Uponor Pex-a pipes were used to install the system.
During the reconstruction of the stadium, not only the infrastructure for sports activities was renewed, but new, comfortable lodges with a capacity of more than 15 thousand spectators were added as well.

Fakten zum Projekt

Kaunas, Lithuania
Sportanlagen
Fertigstellung: 2022

Beteiligung von Uponor

Snow and ice melting system Uponor Meltaway | Uponor Meltaway PE-Xa pipe (25 x 2.3) – whole area – 31 860 m (54 x 590 m) | Uponor Meltaway d160 collectors (36 pcs x 12 (6m) cc 500 (in all – 216 contours)).

2022.01.29 Reportage from "Statybų Gidas"

Watch the second reportage (2022.02.05) HERE
Description:

Certificates: UEFA category 4 certificate.

Location: Ąžuolynas park, Žaliakalnis, Perkūno alley, Kaunas city, Lithuania.

Uponor solutions: Snow and ice melting system Uponor Meltaway.

History:
Darius and Girėnas state stadium was first opened in 1925 and underwent its first major renovation in 1998 when it was upgraded to UEFA regulations of the time. Later on, in 2005 it underwent a major modernization – the biggest television screen in all of the Baltic countries was installed. The latest renovation started in 2018 and is scheduled to be completed in 2022.

Benefits of lawn heating:
  • Heated field can be used all year-‘round – season starts earlier and ends later than on regular stadiums.
  • Protection against ground frostbite – reducing the number of injuries sustained during matches – accident prevention.
  • Fallen snow is melted almost immediately and moisture does not remain on the lawn.
  • Positive effect on the lawn (when operated correctly).
Project information:
  • Field length – 105 m
  • Width – 68 m
  • Whole area –7500 m2
  • Heated area – 7140 m2
Main data of the system installed:
  • 25 cm pitch in the pipe contours
  • Contours are combined using the Tichelmann principle
  • HDPE d200 mm pipes up to Meltaway manifolds
  • Heat carrier with glycol – 40%. Its parameters – 40/30℃

Dariaus ir Girėno Stadionas

Dariaus ir Girėno Stadionas

Informationen zum Projekt

Informationen zum Projekt

Adresse
Perkūno al. 5, Žaliakalnis, Kaunas
Land
Lithuania
Fertigstellung
2022
Art des Projekts
Renovierung
Gebäudetyp
Sportanlagen
Produktlinien
Ecoflex Thermo, Uponor Ecoflex, Meltaway

Partner

Partner
Technical project promoter UAB "Bendrieji Statybų Projektai"

Ähnliche Projekte

Sieben Welten

Sieben Welten

Asien, Afrika, Andalusien, Mexiko, Arabien, Indien und Japan erleben – Uponor unterstützt das Energiekonzept des "Sieben Welten Therme & Spa Resorts".

Stades de Bienne

 

Mit den Stades de Bienne entsteht in Biel ein neues, vielseitig nutzbares und überregional attraktives Begegnungszentrum für Sport, Kultur, Wirtschaft, Gastronomie und Shopping. Die Eröffnung findet 2015 statt. Die Uponor AG Schweiz versorgte hier mit thermoaktiven Bauteilsystemen (TABS).

Silvretta Therme

Silvretta Therme

Mitten in den Tiroler Bergen entstand eine Therme, die Wellness und Entspannung vom Feinsten bietet. Passend zum nachhaltigen Energiekonzept kommen in der Silvretta Therme mehrere Uponor Produkte zum Einsatz – allen voran die Fußboden- und Deckenheizung und -kühlung.
Boost to energy efficiency

Boost to energy efficiency

PowerPark's indoor karting hall became a functional and comfortable multipurpose hall when concrete replaced the asphalt floor and an energy-efficient and cost-effective Uponor Quattro floor heating system was installed underneath.
Icerink in "Városliget"

Icerink in "Városliget"

The history of the skating-rink The skating-rink of the Városliget, which was opened in 1926, was the second skating-rink (after Vienna) in Europe. In WWII it suffered a bomb hit, and in the 1950's it was only repaired temporarily. The latest large-scale renovation was carried out in 1986, when the modified power-house and condenser plant were installed, and the new, third layer of pipes was laid on the rink. After some small and large engineering modifications (1999 to 2001) – since the engineering system was outdated and spoiled – Municipality of Budapest called for a tender for comprehensive architectural and engineering reconstruction of the Skating-rink of Városliget.
Thermal Bath in Egerszalók

Thermal Bath in Egerszalók

The real sight of Egerszalók is the thermal well springing in the Southern part of the village, and the travertine hill created by the running water, which became known as the "salt-hill" over the years.
Ice-rink in Pesterzsébet

Ice-rink in Pesterzsébet

The facility is located in district XX. of Budapest, at Zodony street 1., in the area near the Gubacsi bridge and the Helsinki road, in the vicinity of the Gubacsi residential block and the Mediterrán subdivision.
"Žalgirio" Arena

"Žalgirio" Arena

Žalgirio Arena has been given a BREEAM In-Use certificate – the first for an existing sports venue in the world.

Stavanger Concert Hall

Stavanger Concert Hall

The new concert hall is an outstanding building and a new benchmark. Uponor has been involved for the underfloor heating and plumbing system as well as snow melting system for outdoor areas.
Addenbrookes Hospital

Addenbrookes Hospital

Addenbrook hospital was one of the first provincial voluntary hospitals in UK and is currently undergoing a renovation program to replace all the service pipework.
Ashville Sports Centre, Harrogate

Ashville Sports Centre, Harrogate

As part of a £3million project, Ashville Sports Centre will be redeveloped by September 2017.
Once completed, the sports centre will boast a significantly enlarged gymnasium, a studio, 9 changing facilities, a reception/café area and new staff offi ces. The swimming
pool will also be redecorated and receive much needed maintenance.
CEF headquarters, Durham

CEF headquarters, Durham

When national electrical wholesaler company, City Electrical Factors (CEF), decided to invest in construction of a new 3,500m2 headquarters to provide a more contemporary, fit for purpose and environmentally efficient office environment, the resulting design from architect Faulkner Brown was a very conceptual, fair faced concrete building.
Dudley College, Dudley

Dudley College, Dudley

 The Advance II project is part of a transformation programme at Dudley College and the fifth new teaching facility to be constructed as part of the ‘Dudley Learning Quarter’ campus development.
Manchester Metropolitan University, Manchester

Manchester Metropolitan University, Manchester

The innovative building, incorporates three individual towers and two atria and  boasts not only world-class teaching and learning facilities for students, staff and businesses, but also catering and leisure areas for all students, and conference venues which will draw companies and industry associations from across Europe and beyond.
Mooreland Care Home

Mooreland Care Home

Uponor Ltd provided the complete solution to Mooreland Care Home's heating and plumbing needs, offering complete flexibility and also a quality installation.
Toyota Park

Toyota Park

See how our turf-conditioning application using Wirsbo hePEX™ provided a chilly mid-western soccer stadium with...