Kamo
Referenzbericht

Dudley College, Dudley, Dudley, United Kingdom

Dudley College, Dudley

Fakten zum Projekt

Dudley, United Kingdom
Sportanlagen
Fertigstellung: 2017

Beteiligung von Uponor

TABS

The £12 million scheme is a teaching centre for advanced construction methods and technologies. It is the first UK project to be built using the IPI (integrated project insurance) procurement and delivery model, which put collaboration at the heart of the design and construction process. The brief was to create a building that is as operationally efficient as possible for the available budget, using forward-focused technologies that complement its purpose as a centre of learning for tomorrow’s construction professionals.


Uponor’s Involvement
Uponor worked closely with the project team and the college’s estates team to ensure that the TABS (Thermally Active Building System) was embedded in the design and the BIM level 2 model. The Uponor team arranged a site visit to the TABS installation at Manchester Metropolitan University to demonstrate the benefits of the technology.
Thermal modelling data was used to estimate the heating and cooling requirements for the 3,500m2 building to ensure correct specification and the TABS system has been specified to complement the highly insulated building envelope, with external weather stations controlling the TABS via actuators.


The Benefits
The Uponor TABS installation has enabled all heating, cooling and domestic hot water to be powered by just two domestic boilers (with a third for standby) and avoided the need for any additional heating, air conditioning or mechanical ventilation. By working with the efficient building envelope, the system delivers an ambient indoor temperature all year round with minor adjustments of +/- 4-5 degrees, and weather station controls provide a true, fit and forget, maintenance free solution.

 

 

Informationen zum Projekt

Informationen zum Projekt

Land
United Kingdom
Webseite
/Country specific/UK/Images/Projects/Dudley College
Fertigstellung
2017
Art des Projekts
Neubau
Gebäudetyp
Sportanlagen
Produktlinien
Contec

Partner

Partner
Client
Dudley College
Contractor
Bowman and Kirkland
M&E contractor
Derry Building Services
Architects
Metz Architect – James Blood & Joe Marlow                   
 

Ähnliche Projekte

Sieben Welten

Sieben Welten

Asien, Afrika, Andalusien, Mexiko, Arabien, Indien und Japan erleben – Uponor unterstützt das Energiekonzept des "Sieben Welten Therme & Spa Resorts".

Stades de Bienne

 

Mit den Stades de Bienne entsteht in Biel ein neues, vielseitig nutzbares und überregional attraktives Begegnungszentrum für Sport, Kultur, Wirtschaft, Gastronomie und Shopping. Die Eröffnung findet 2015 statt. Die Uponor AG Schweiz versorgte hier mit thermoaktiven Bauteilsystemen (TABS).

Silvretta Therme

Silvretta Therme

Mitten in den Tiroler Bergen entstand eine Therme, die Wellness und Entspannung vom Feinsten bietet. Passend zum nachhaltigen Energiekonzept kommen in der Silvretta Therme mehrere Uponor Produkte zum Einsatz – allen voran die Fußboden- und Deckenheizung und -kühlung.
Boost to energy efficiency

Boost to energy efficiency

PowerPark's indoor karting hall became a functional and comfortable multipurpose hall when concrete replaced the asphalt floor and an energy-efficient and cost-effective Uponor Quattro floor heating system was installed underneath.
Icerink in "Városliget"

Icerink in "Városliget"

The history of the skating-rink The skating-rink of the Városliget, which was opened in 1926, was the second skating-rink (after Vienna) in Europe. In WWII it suffered a bomb hit, and in the 1950's it was only repaired temporarily. The latest large-scale renovation was carried out in 1986, when the modified power-house and condenser plant were installed, and the new, third layer of pipes was laid on the rink. After some small and large engineering modifications (1999 to 2001) – since the engineering system was outdated and spoiled – Municipality of Budapest called for a tender for comprehensive architectural and engineering reconstruction of the Skating-rink of Városliget.
Thermal Bath in Egerszalók

Thermal Bath in Egerszalók

The real sight of Egerszalók is the thermal well springing in the Southern part of the village, and the travertine hill created by the running water, which became known as the "salt-hill" over the years.
Ice-rink in Pesterzsébet

Ice-rink in Pesterzsébet

The facility is located in district XX. of Budapest, at Zodony street 1., in the area near the Gubacsi bridge and the Helsinki road, in the vicinity of the Gubacsi residential block and the Mediterrán subdivision.
"Žalgirio" Arena

"Žalgirio" Arena

Žalgirio Arena has been given a BREEAM In-Use certificate – the first for an existing sports venue in the world.

Stavanger Concert Hall

Stavanger Concert Hall

The new concert hall is an outstanding building and a new benchmark. Uponor has been involved for the underfloor heating and plumbing system as well as snow melting system for outdoor areas.
Addenbrookes Hospital

Addenbrookes Hospital

Addenbrook hospital was one of the first provincial voluntary hospitals in UK and is currently undergoing a renovation program to replace all the service pipework.
Ashville Sports Centre, Harrogate

Ashville Sports Centre, Harrogate

As part of a £3million project, Ashville Sports Centre will be redeveloped by September 2017.
Once completed, the sports centre will boast a significantly enlarged gymnasium, a studio, 9 changing facilities, a reception/café area and new staff offi ces. The swimming
pool will also be redecorated and receive much needed maintenance.
CEF headquarters, Durham

CEF headquarters, Durham

When national electrical wholesaler company, City Electrical Factors (CEF), decided to invest in construction of a new 3,500m2 headquarters to provide a more contemporary, fit for purpose and environmentally efficient office environment, the resulting design from architect Faulkner Brown was a very conceptual, fair faced concrete building.
Manchester Metropolitan University, Manchester

Manchester Metropolitan University, Manchester

The innovative building, incorporates three individual towers and two atria and  boasts not only world-class teaching and learning facilities for students, staff and businesses, but also catering and leisure areas for all students, and conference venues which will draw companies and industry associations from across Europe and beyond.
Mooreland Care Home

Mooreland Care Home

Uponor Ltd provided the complete solution to Mooreland Care Home's heating and plumbing needs, offering complete flexibility and also a quality installation.
Toyota Park

Toyota Park

See how our turf-conditioning application using Wirsbo hePEX™ provided a chilly mid-western soccer stadium with...