Mooreland Care Home, Cambridgeshire, United Kingdom

Mooreland Care Home

Fakten zum Projekt

Cambridgeshire, United Kingdom
Sportanlagen
Flächenheizung und -kühlung, Verbundrohrsysteme
Fertigstellung: 2007

Beteiligung von Uponor

0
Catering for an ageing population is without
question having an impact on the way companies across the UK market their
product to the 'Grey' market. The construction industry is no different, using
its skills to accommodate the growing market for care and residential homes.
Other than the obvious amenities some of the residents require; underfloor
heating offers a number of key benefits that ensures the residents are kept in
the utmost comfort. Uponor Housing Solutions provided the complete solution to
Mooreland Care Home's heating and plumbing needs, offering a product that gave
complete flexibility but at the same time ensured a quality installation.
Having used Uponor MLC before, it seemed like the ideal choice for the £45m
phase 1 development covering 35 rooms per block, which occupies the same site
as the existing care home.

Installer John Kay was extremely specific in the
product needs for the project; they wanted a pipe company that could provide
all pipework from the UFH to the larger diameter service pipework within the
building. The development was carried out with complete precision, used MLC
pipe in the service pipework and PEX20 pipework in the UFH application. The
service pipework; flexible and lightweight to install; allowed John Kay to
complete the job to the highest standard without the need for hotworks, an
important factor in current safety conscious conditions. The domestic pipework
was then bent to form neat 90 degree turns, eliminating the need for additional
fittings, and fitted to fixture with the streamline press fit system.

The installation utilised the new range of colour
coded fittings, that directly replaced the existing Uponor MLCP from September
2007 metal press fittings have a range of sizes in 16mm, 20mm, 25mm and 32mm.
The overall appearance of the joint after compression is neater and cleaner
than any other joint in the market place, and falls apart to give an immediate
visual indication that a secure joint has been made. The many metres of service
pipework, delivered on site in straight lengths could be attached to the
fittings in seconds. The labour savings over traditional methods are
unsurpassed, yet still share a number of key attributes including minimal
expansion properties, vital in large service work.

Lastly
the UFH is ideal for care homes; the heating is hygienic, by not circulating
bacteria around the room; it is comfortable, maintaining an ambient
temperature; and lastly when combined with Uponor’s new control system, it is
easy to control making the most of tamper proof controls in community areas.

 

Mooreland Care Home

0001034

Informationen zum Projekt

Informationen zum Projekt

Land
United Kingdom
Fertigstellung
2007
Art des Projekts
Neubau
Gebäudetyp
Sportanlagen

Partner

Partner

contractor
Barlcay Living Division

specifier
MLM

installer
John Kay Mechanical

Ähnliche Projekte

Sieben Welten

Sieben Welten

Asien, Afrika, Andalusien, Mexiko, Arabien, Indien und Japan erleben – Uponor unterstützt das Energiekonzept des "Sieben Welten Therme & Spa Resorts".

Stades de Bienne

 

Mit den Stades de Bienne entsteht in Biel ein neues, vielseitig nutzbares und überregional attraktives Begegnungszentrum für Sport, Kultur, Wirtschaft, Gastronomie und Shopping. Die Eröffnung findet 2015 statt. Die Uponor AG Schweiz versorgte hier mit thermoaktiven Bauteilsystemen (TABS).

Silvretta Therme

Silvretta Therme

Mitten in den Tiroler Bergen entstand eine Therme, die Wellness und Entspannung vom Feinsten bietet. Passend zum nachhaltigen Energiekonzept kommen in der Silvretta Therme mehrere Uponor Produkte zum Einsatz – allen voran die Fußboden- und Deckenheizung und -kühlung.
Boost to energy efficiency

Boost to energy efficiency

PowerPark's indoor karting hall became a functional and comfortable multipurpose hall when concrete replaced the asphalt floor and an energy-efficient and cost-effective Uponor Quattro floor heating system was installed underneath.
Icerink in "Városliget"

Icerink in "Városliget"

The history of the skating-rink The skating-rink of the Városliget, which was opened in 1926, was the second skating-rink (after Vienna) in Europe. In WWII it suffered a bomb hit, and in the 1950's it was only repaired temporarily. The latest large-scale renovation was carried out in 1986, when the modified power-house and condenser plant were installed, and the new, third layer of pipes was laid on the rink. After some small and large engineering modifications (1999 to 2001) – since the engineering system was outdated and spoiled – Municipality of Budapest called for a tender for comprehensive architectural and engineering reconstruction of the Skating-rink of Városliget.
Thermal Bath in Egerszalók

Thermal Bath in Egerszalók

The real sight of Egerszalók is the thermal well springing in the Southern part of the village, and the travertine hill created by the running water, which became known as the "salt-hill" over the years.
Ice-rink in Pesterzsébet

Ice-rink in Pesterzsébet

The facility is located in district XX. of Budapest, at Zodony street 1., in the area near the Gubacsi bridge and the Helsinki road, in the vicinity of the Gubacsi residential block and the Mediterrán subdivision.
"Žalgirio" Arena

"Žalgirio" Arena

Žalgirio Arena has been given a BREEAM In-Use certificate – the first for an existing sports venue in the world.

Stavanger Concert Hall

Stavanger Concert Hall

The new concert hall is an outstanding building and a new benchmark. Uponor has been involved for the underfloor heating and plumbing system as well as snow melting system for outdoor areas.
Addenbrookes Hospital

Addenbrookes Hospital

Addenbrook hospital was one of the first provincial voluntary hospitals in UK and is currently undergoing a renovation program to replace all the service pipework.
Ashville Sports Centre, Harrogate

Ashville Sports Centre, Harrogate

As part of a £3million project, Ashville Sports Centre will be redeveloped by September 2017.
Once completed, the sports centre will boast a significantly enlarged gymnasium, a studio, 9 changing facilities, a reception/café area and new staff offi ces. The swimming
pool will also be redecorated and receive much needed maintenance.
CEF headquarters, Durham

CEF headquarters, Durham

When national electrical wholesaler company, City Electrical Factors (CEF), decided to invest in construction of a new 3,500m2 headquarters to provide a more contemporary, fit for purpose and environmentally efficient office environment, the resulting design from architect Faulkner Brown was a very conceptual, fair faced concrete building.
Dudley College, Dudley

Dudley College, Dudley

 The Advance II project is part of a transformation programme at Dudley College and the fifth new teaching facility to be constructed as part of the ‘Dudley Learning Quarter’ campus development.
Manchester Metropolitan University, Manchester

Manchester Metropolitan University, Manchester

The innovative building, incorporates three individual towers and two atria and  boasts not only world-class teaching and learning facilities for students, staff and businesses, but also catering and leisure areas for all students, and conference venues which will draw companies and industry associations from across Europe and beyond.
Toyota Park

Toyota Park

See how our turf-conditioning application using Wirsbo hePEX™ provided a chilly mid-western soccer stadium with...