S Group’s logistics centre for utility items, Sipoo, Finland

S Group’s logistics centre for utility items

The foundation stone of the new logistic centre for the S Group, to be built in Sipoo, was laid in March 2010, and the centre is scheduled for completion during 2012. Ten times larger than the Finnish Parliament building and corresponding to approximately 2,350 detached family houses, the total floor space of the building will be 75,000 gross square metres and its gross capacity will total over one million cubic metres.

Fakten zum Projekt

Sipoo, Finland
Bürogebäude
Trinkwasser, Kanalisation, Regenwasser
Fertigstellung: 2012
Almost all of the heating and cooling energy required by the logistics centre will be produced in a hybrid plant operated on renewable and zero-CO2 energy sources. Based on the use of geothermal energy and wood pellets, the plant will produce only 400 tonnes of carbon dioxide a year, while producing an equal amount of energy by district heat would result in 6,000 tonnes of carbon dioxide emissions a year. The hybrid plant is the largest geothermal energy facility implemented in Finland.

Large scale poses challenges

The main contractor of the earth construction work, Maarakennusliike Lehtonen Oy, began its work in November 2009 and handed over the task of main contractor to Lemminkäinen from the beginning of May 2010.

“We’re responsible for the excavation, indoor and outdoor pipes, drainage and storm water gullies. The contract period is one year, so our share of the work will be completed in mid-December this year,” Construction Manager Esa Hakkarainen of Maarakennusliike Lehtonen explains.

“In terms of scale, this is an extremely large individual project. The laid concrete alone will amount to approximately 6,000 m3. We’ll install a total of 13 kilometres of indoor and outdoor drains and a similar length of electricity protection pipes. The number of wells, including cable manholes, totals 260.

“It’s important for the client that the strorm water gullies and pipes come from the same place to ensure the absolute reliability of joints. All products to be used were approved by the client in advance, and the approval was subject to the products having been documented and the necessary product data being available for them.

” Uponor has delivered in excess of two kilometres of 893/800 mm storm water pipe and approximately 200 wells to the site of the logistics centre. Sewerage will be implemented with the 200 mm Uponor Dupplex sewer system and the water pipes with the 315 mm Uponor Profuse pressure pipe system.

“Uponor’s references carried a lot of weight in the selection. All aspects in this project have functioned extremely well. I’m pleased that we can discuss things with just one supplier in this product area and that the same parts can be used in several locations. Our collaboration with Uponor goes back decades and we also have previous experience in major joint ventures, such as the Helsinki-Vantaa Airport.

“The project has progressed according to schedule, despite the harsh winter weather conditions this year. The cold weather did not hamper the progress too much, because all the pipes needed grooves to be excavated into the rock. The landfill material was well-compacted and the entire southern side was completed during the winter.” “In a project of this scale, it’s crucially important that deliveries are carried out on time. In this respect, we’ve had no problems with Uponor whatsoever,” Supervisor Markku Tepsa of Maarakennus Lehtonen confirms.

At its busiest, the earth construction project has employed more than 80 men, including subcontractors.

The total investment for the Sipoo logistics centre is approximately EUR 150 million. After completion, the centre will provide employment for about 700 people. The employment effect during construction is several thousand person-years.

S Group’s logistics centre for utility items

0001914

Informationen zum Projekt

Informationen zum Projekt

Land
Finland
Fertigstellung
2012
Art des Projekts
Neubau
Gebäudetyp
Bürogebäude

Partner

Partner

contractor
Maarakennusliike Lehtonen Oy

Ähnliche Projekte

Klimahaus Bremerhaven 8° Ost

Klimahaus Bremerhaven 8° Ost

Das Klimahaus Bremerhaven 8° Ost ist eine Wissens- und Erlebniswelt, die den Themenkomplex Klima & Klimawandel leicht verständlich und wissenschaftlich exakt einer breiten Öffentlichkeit präsentiert.
Kranhäuser

Kranhäuser

Spektakuläre Architektur zeichnet die drei Kranhäuser am Kölner Rheinauhafen aus. Uponor lieferte die Betonkernaktivierung Contec zur stillen Deckenkühlung.
Brain Box Berlin

Brain Box Berlin

Thermische Betonkernaktivierung mit Uponor Contec sorgt für die wirtschaftliche, energieeffiziente und nachhaltige Gebäudetemperierung im neuen Wahrzeichen für das Wissenschafts- und Technologiezentrum Adlershof
Leitradlofts, Köln

Leitradlofts, Köln

Der neue Bürokomplex erhielt eine hygienisch optimale Trinkwasser-Installation – dank Uni Pipe PLUS innerhalb kürzester Zeit.
Villeroy & Boch

Villeroy & Boch

Auf dem Firmengelände des Hauptsitzes von Villeroy & Boch in Mettlach wurde ein Teil des historischen Abteikomplexes generalsaniert.
AURON

AURON

Die Betonoberflächenaktivierung Uponor Contec ON heizt und kühlt den Bürogebäudekomplex AURON in München.
Energy Efficiency Center

Energy Efficiency Center

Das Energy Efficiency Center in Würzburg wird im Eingangsbereich, im Infocenter und im Veranstaltungsraum energieeffizient von Uponor Klett temperiert.
Ericusspitze Spiegelhaus

Ericusspitze Spiegelhaus

Der neue Konzernhauptsitz der Spiegel-Gruppe liegt auf der Ericusspitze. Die Betonkernaktivierung Contec von Uponor sorgt für angenehme Temperierung.
Bayer Qingdao ECB Lighthouse

Bayer Qingdao ECB Lighthouse

ECB Lighthouse, which serves as the administration building of a Bayer MaterialScience plant in Qingdao, is the first building in China of the Bayer Eco Commercial Building (ECB) Program.
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti

The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti

In November 2011 one of the largest shopping centers of Finland was opened in Lahti. The Karisma shopping centre is one of Finland´s largest shopping centers measured by sales area and number of stores. Developer of Karisma is Kesko. Construction of Karisma has been one of the biggest investments ever in retail trade of Kesko. The main contractor of Karisma was SRV Rakennus ltd.
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Immeuble Delta Green

Immeuble Delta Green

La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.

Standard Bank

Standard Bank

Uponor PE-Xa pipe used for refurbishment of chilled water pipelines in the head office of South Africa's Standard Bank located in Johannesburg.
Palazzo Ferrazzi - Brescia

Palazzo Ferrazzi - Brescia

Uponor brings the comfort of its Underfloor Heating & Cooling to a prestigious renovation project to transform a Norther Italy 1700s Palace into comfortable offices
Posco Green building

Posco Green building

POSCO Green Building located on the Yonsei University International Campus in Songdo,  has been equipped with radiant underfloor heating and cooling and Comfort panels from Uponor.
National Library of Latvia

National Library of Latvia

National Library of Latvia is the most impressive industrial project in Latvia of the last decade. Uponor provided the building with Uponor underfloor heating and MLCP pipes.
Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
Rivergate

Rivergate

The RIVERGATE office building in Vienna, Austria, was certified as a Green Building by the EU andrelies on the efficient Contec ON concrete surface activation.
Berger Logistik

Berger Logistik

Berger Logistik transports goods by land, sea and air around the globe. The company was founded in 1961 by Johann Berger and is based in Wörgl, in the Tyrol region of Austria. 
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

New office in Västerås with a focus on modern and environmentally friendly solutions

New office in Västerås with a focus on modern and environmentally friendly solutions

The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.
HAMK's zero-energy hall uses energy piles

HAMK's zero-energy hall uses energy piles

Construction of Finland's first virtually zero-energy hall was completed in May 2015. The hall was built for the Thin Sheet Centre research unit of the Häme University of Applied Sciences (HAMK) and it draws its energy primarily from energy piles and solar panels.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

Poslovni centar Adris grupe

Poslovni centar Adris grupe

Arhitektonski projekt poslovnog centra Adris u Jagićevoj ulici 33. u Zagrebu, spoj je klasičnog i modernog. Gradnja poslovnog centra započeta je 2011., a završena 2015. kada se u nju smještaju zaposlenici Adris grupe i Croatia osiguranja. 
City Hall

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
Magnum Business center

Magnum Business center

MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.

MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.

Edificio de oficias en calle Tutor

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.
Ilmalanlinna, Helsinki

Ilmalanlinna, Helsinki

Due to the interest rates of the floor structures, underfloor heating at Uponor's new head office required a solution that would raise the floor surface as little as possible. A functional result was achieved with an unusual implementation, low-structure underfloor heating plates, which are mainly used in renovations of detached houses, and which increase the floor height by only 15 millimetres.